Simrad SP270 Manuale di Installazione Pagina 77

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 254
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 76
Installation procedures
33
851-160572 / B
Signal phase 1: S1-L (20-70V) pin 2
S1-M (80-140V) pin 9
S1-H (150-220V) pin 1
Signal phase 2: S2-L (20-70V) pin 11
S2-M (80-140V) pin 3
S2-H (150-220V) pin 10
Signal phase 3: S3-L (20-70V) pin 5
S3-M (80-140V) pin 12
S3-H (150-220V) pin 4
Reference: +/- REF pin 7
-/+ REF (see note) pin 15
Note If the output voltage is only half-wave rectified, the other
reference from the gyro which is not used for the three phases
must be connected to pin 15.
2 Locate the 15 pin D-connector, the connector housing and
the shrink tube in the spare parts box. Refer to the output
voltage which was written into the table for the stepper
data specifications, and make the connections to the
15-pin D-connector with reference to the pin-connection
list above. Also refer to figure 21 which shows the pin
location of the connector seen from the wire soldering
side. The cable screen should be connected to the
connector housing.
9 10 11 12 13 14 15
FEMALE
(CD1871)
S1-M
S2-H
S2-L
S3-M
-/+ REF
S1-H
S1-L
S2-M
S3-H
S3-L
+/- REF
1 2 3 4 5 6 7 8
Figure 21 Connections for a
gyro with stepper output
In order to read the data from the gyro, some DIL switches on
the printed circuit board in the electronic drawer unit behind the
operator panel must be selected. Use the following procedure to
set the switches.
Vedere la pagina 76
1 2 ... 72 73 74 75 76 77 78 79 80 81 82 ... 253 254

Commenti su questo manuale

Nessun commento